[Construction Case] Replacement Work of Storage Tank at a Certain Hospital
Introducing a replacement project due to PVC tank leakage, with a production time of 1 month and a work time of 1 day!
We would like to introduce a case study of a tank replacement project carried out by Kansai Chemical Co., Ltd. at a certain hospital. The project was considered due to leakage from the existing tank and the need for improved durability. As a countermeasure, we replaced the tank with a PVC tank that has been enhanced for durability through weather-resistant coating. 【Project Data】 ■ Content: Replacement work due to leakage from PVC tank ■ Issues: Replacement due to leakage from the existing tank and improvement of durability ■ Countermeasure: Replacement with a PVC tank that has been enhanced for durability through weather-resistant coating *For more details, please refer to the PDF document or feel free to contact us.
- Company:関西化工
- Price:Other